Late updated: 13 Nov 2026 09:11
Our involvement in this Portsmouth park project began with a call from a local facilities representative who was concerned about the condition of an established children's play area.
The park was well used by families throughout the week, but the existing rubber safety surfacing had gradually deteriorated. Several sections were cracked, the edges had started lifting in places, and the original colours had faded considerably.
The client had already arranged minor repairs over the years, but these were becoming less effective as the surrounding material continued to age.
They wanted a longer-term solution that would improve the playground's appearance while addressing the damaged areas properly.
Rather than recommending another round of isolated patch repairs, we suggested a more comprehensive resurfacing scheme.
The aim was straightforward: retain the serviceable play equipment, replace the defective rubber flooring and introduce a modern finish that would suit the surrounding public park.
During our initial inspection, we walked around the playground with the park's maintenance representative.
They pointed out the sections that had caused the most concern, particularly around the climbing equipment and at the entrances to the play area.
One question came up repeatedly during our conversation.
"Can we keep the playground looking familiar while making it feel new again?"
We explained that the existing layout could remain largely unchanged, provided the equipment and its installation remained suitable.
The main improvements would come from replacing the worn flooring, preparing the underlying base and introducing a fresh colour scheme.
We proposed a wet pour rubber system incorporating a recycled SBR shockpad and coloured EPDM wearing course in the relevant play areas.
The specification would be selected to provide suitable impact attenuation for the equipment's critical fall heights, supported by appropriate BS EN 1177 test evidence.
The client chose a combination of dark green, light green and blue, avoiding overly complicated patterns that could make future repairs more noticeable.
Once the project was approved, we prepared a programme of approximately six working days.
The first stage involved securing the playground and arranging the removal of the damaged surfacing.
We began by cutting the existing rubber into manageable sections and lifting it from the substrate.
This exposed several areas where the underlying construction needed attention.
Although much of the base remained serviceable, some sections had developed localised defects that would have affected the new surface if left untreated.
We explained the findings to the client before continuing.
They were initially surprised that preparation would take almost as long as the visible installation work.
We pointed out that a new wet pour surface relies on a suitable, stable base. Covering existing defects would risk shortening the lifespan of the replacement flooring.
The client agreed that the additional preparation was worthwhile.
During the second day, we discovered that one section near the playground entrance had retained moisture beneath the old surface.
The area needed further investigation before the new rubber could be installed.
We removed the unsuitable material, corrected the localised base defect and checked the adjoining drainage arrangement.
This added some work to the preparation stage, but we were able to reorganise the remaining programme without extending the overall installation significantly.
We also checked the perimeter restraints and transitions to the existing pathways.
These details were especially important in a public park, where visitors regularly enter and leave the playground from several directions.
With the preparation complete, our team moved on to the wet pour installation.
The recycled SBR rubber granules were mixed with the specified polyurethane binder and installed to the required depth in the equipment impact areas.
Once the base layer was ready for the next stage, we applied the coloured EPDM wearing course.
Our installers mixed the EPDM granules with binder in controlled batches and hand-trowelled the material to achieve a consistent finish.
The new colour scheme was designed to provide a clean, modern appearance without overwhelming the existing equipment.
Dark green was used around the perimeter, with lighter green and blue sections defining the central play areas.
We paid particular attention to the edges, equipment supports and transitions between the different colours.
The installation stage took approximately three working days, with the remaining time allocated to preparation, finishing and inspections.
On the final working day, we met the maintenance representative to review the completed surface.
The difference was immediately noticeable.
The playground no longer had the patchwork appearance created by years of small repairs, and the new rubber flooring provided a consistent finish across the main play areas.
The client was particularly pleased with the entrance sections, where the previous surface had been lifting.
We explained how the new edges had been finished and discussed the importance of monitoring these areas during routine inspections.
We also provided guidance on cleaning and maintaining wet pour rubber, including removing debris, checking for localised damage and arranging prompt repairs when necessary.
The playground remained closed until the polyurethane binder had cured sufficiently and the required reopening checks had been completed.
The Portsmouth park project took approximately six working days on site, followed by the necessary curing period.
By retaining suitable existing equipment and concentrating on the damaged surfacing, we were able to refresh the play area without carrying out an unnecessary full redevelopment.
The completed wet pour system addressed the deteriorated flooring and provided a more consistent appearance, with impact-attenuating performance specified for the relevant equipment.
For our team, the project demonstrated that playground improvements do not always require dramatic changes.
Sometimes, careful removal, proper base preparation and a well-installed replacement surface are enough to make an established public play area feel welcoming again.
We carry out playground resurfacing, wet pour rubber installation and safety flooring repairs for parks, schools, nurseries and community facilities across the UK.
Whether your existing surface has cracked, lifted at the edges or deteriorated through regular use, our team can assess the condition and discuss suitable repair or replacement options.
Contact us today to request a quotation for your playground surfacing project.