The Manchester Playground Redevelopment: From Empty Space to Adventure Zone

Get in Touch

Not every playground project begins with broken equipment or worn-out safety surfacing.

Sometimes, the biggest challenge is working out how to turn a completely unused area into somewhere children genuinely want to spend time.

That was exactly the situation when we were contacted about a playground redevelopment project in Manchester.

The client managed a community facility with a sizeable outdoor area that had never been properly developed.

Apart from a small pathway and some basic landscaping, the space offered very little for families visiting the site.

They wanted to create an adventure-themed playground featuring climbing equipment, slides, balancing activities and designated spaces for younger children.

However, they were unsure how much equipment could realistically fit within the available area.

Our first task was to help them turn their ideas into a practical playground design.

The Question That Shaped the Project

During our initial meeting, the client asked us something that influenced the entire design.

"Can we make it exciting without overcrowding the space?"

It was a sensible question.

The client wanted an impressive play facility, but we explained that a successful playground needs more than a collection of equipment.

Appropriate equipment clearances, impact areas, access routes and opportunities for different types of play all need to be considered.

We suggested creating an adventure zone with a central climbing structure, a separate low-level play area and a series of smaller challenges connecting the different sections.

This approach would allow children to explore the playground without every activity competing for the same space.

The client also wanted the playground to appeal to a broad age range.

We therefore recommended equipment with different levels of physical challenge, rather than relying entirely on one large climbing frame.

From Initial Sketches to an Agreed Design

The design and consultation stage lasted approximately three weeks.

During this period, we carried out site measurements, reviewed ground conditions and developed the proposed playground layout.

The agreed scheme included a multi-level climbing unit with slides, a balance trail, stepping features, low-level play equipment and seating around the perimeter.

We also incorporated suitable access routes and a combination of hardstanding and impact-attenuating surfacing.

The equipment selection and layout were developed with reference to the applicable BS EN 1176 playground equipment requirements.

Where safety surfacing was necessary, we specified systems with appropriate impact-attenuation performance for the relevant equipment fall heights, supported by BS EN 1177 testing.

The client chose a combination of natural timber-style finishes and brighter colours to give the playground an adventurous appearance without making the entire area feel overly artificial.

Once the design was approved, we agreed on a construction programme of approximately six weeks.

The First Setback: A Week of Heavy Rain

We had originally planned to begin the main groundworks shortly after the site was handed over.

Unfortunately, persistent rainfall made the ground too wet for the excavation and sub-base preparation we had scheduled.

Rather than risk disturbing the formation or attempting to compact saturated material, we agreed with the client to postpone the main groundworks for approximately one week.

We explained that rushing this stage could cause problems beneath the finished playground.

The client understood the reasoning and appreciated being informed before the delay affected deliveries and other arrangements.

Once the ground conditions improved, we returned to begin the construction work.

Turning the Ground Into a Playground

The first stage involved establishing the construction area, removing unsuitable vegetation and excavating the sections required for the new play equipment and surfacing.

Our team then installed the specified foundations and prepared the sub-base areas.

We checked levels throughout the site and made sure the proposed drainage arrangements were suitable for the finished layout.

During the following two weeks, the main playground equipment began to take shape.

The central climbing structure was installed first, followed by the slides, balance equipment and smaller play features.

We used the manufacturer's installation instructions to determine foundation requirements, fixing arrangements and assembly procedures.

Once the equipment was secured, we checked the clearances and impact areas before progressing with the surrounding surfaces.

Choosing Different Surfaces for Different Activities

One of the features that made this project interesting was the combination of surfacing materials.

The client did not want a single material covering the entire playground.

Instead, we developed a specification that used wet pour rubber in selected equipment impact areas, alongside suitable paths and landscaped sections.

The wet pour installation involved laying a recycled SBR rubber shockpad to the specified thickness, followed by a coloured EPDM wearing course.

Our team mixed and installed the materials in accordance with the chosen system's requirements, carefully finishing around the equipment supports and playground boundaries.

We used a combination of earthy green and warm orange tones to distinguish the play areas.

The surfacing stage took approximately five working days, including preparation and installation, with further time allowed for curing before access was permitted.

Meanwhile, our team completed the surrounding pathways, seating positions and remaining landscaping details.

The Final Walkaround

At the end of the construction programme, we invited the client to walk through the completed playground with our project manager.

It was the first opportunity to review the entire layout as a finished facility rather than a collection of individual construction stages.

The client was particularly pleased with the central climbing structure and the way the smaller play challenges connected the different sections.

They also commented that the playground felt spacious despite the amount of equipment installed.

Before handover, we completed our installation checks and arranged the appropriate independent post-installation playground inspection.

We provided maintenance guidance covering routine visual checks, operational inspections, equipment maintenance and ongoing surfacing care.

The playground was only made available for use once the necessary inspections, outstanding actions and curing requirements had been addressed.

From Unused Ground to an Adventure Zone

The finished playground transformed an underused outdoor area into a dedicated recreational facility with climbing, sliding, balancing and imaginative play opportunities.

The project took approximately six weeks of construction work, following the initial design stage, with an additional week's postponement caused by poor ground conditions.

For our team, the most rewarding part was seeing how closely the completed playground matched the client's original ambition.

They had asked for something exciting but not overcrowded, and the final design provided a variety of activities while retaining clear routes and open spaces.

It was a reminder that good playground redevelopment begins with understanding how a space should function, not simply deciding how much equipment can fit inside it.

Could Your Outdoor Space Become the Next Adventure Playground?

We provide playground design, construction, equipment installation and safety surfacing services for schools, community facilities, councils and recreational sites across the UK.

Whether you're developing an unused area or planning a complete playground redevelopment, our team can help you explore practical layouts, suitable equipment and appropriate surfacing systems.

Contact us to discuss your project and request a tailored playground installation quotation.