When we were asked to assess a community playground in Southampton, the client initially thought that several pieces of equipment might need replacing.

The climbing frame, slide and smaller play features had been installed some years earlier, and the area was beginning to look tired.

However, during our first inspection, it became clear that the most immediate concern was the condition of the surrounding safety surfacing.

The existing rubber flooring had deteriorated in several high-traffic areas.

There were cracks around equipment supports, worn sections near the slide exit and patches where the surface had started to separate from its underlying construction.

The playground manager explained that the area remained popular with local families, but maintenance staff were spending increasing amounts of time monitoring the damaged flooring.

The client wanted to improve the playground without undertaking an unnecessary complete equipment replacement.

After reviewing the site, we recommended a targeted resurfacing programme using a new wet pour rubber system.

This would allow the playground to retain its existing equipment, subject to appropriate safety checks, while providing a properly specified impact-attenuating surface around the play features.

Deciding What Needed to Be Replaced

One of the most important conversations took place before any installation work began.

The client asked whether we could simply patch the damaged sections of rubber flooring.

We explained that localised wet pour repairs can be appropriate where the surrounding material and base remain sound.

However, the extent of deterioration across this playground meant that repeated patching would not provide the consistent finish the client wanted.

Several areas also required further investigation to establish whether the underlying shockpad and substrate remained suitable.

We therefore recommended removing the defective surfacing and installing a replacement system across the main equipment zones.

The proposed design incorporated a recycled SBR rubber base layer and a coloured EPDM wearing course.

The required system thickness would be selected according to the relevant equipment fall heights and supported by appropriate impact-attenuation testing under BS EN 1177.

The client chose a combination of green and blue surfacing, with a contrasting orange section around the main climbing equipment.

Rather than introducing complicated graphics, they preferred a simple design that would be easy to maintain and visually consistent.

A Five-Day Resurfacing Programme

We planned the main installation over approximately five working days, followed by the necessary curing period.

The playground was temporarily closed to the public, and the client arranged suitable notices to explain the work.

Our team also installed temporary barriers around the construction area to prevent unauthorised access.

Day One: Removing the Damaged Rubber

The first day involved cutting out and removing the deteriorated wet pour surfacing.

We worked carefully around the existing play equipment, avoiding unnecessary disturbance to the equipment foundations.

Once the old material had been removed, we inspected the exposed base.

Some sections were in reasonable condition, while others needed localised repairs before the new rubber system could be installed.

We also checked the perimeter edges and the transitions between the playground and adjoining pathways.

By the end of the day, the defective flooring had been removed and the main preparation requirements were confirmed.

Day Two: Preparing the Substrate

The second day focused on correcting the areas identified during removal.

Our installers repaired unsuitable sections of the base, cleaned the remaining substrate and checked the levels.

We also reviewed the drainage arrangements to ensure the new surface would not be installed over unresolved standing-water problems.

The client visited during the afternoon and asked whether the new flooring would be noticeably thicker than the original surface.

We explained that the thickness of impact-attenuating rubber flooring must be appropriate for the equipment and the tested performance of the selected system.

Where necessary, we would adjust the construction build-up and surrounding transitions to accommodate the specified depth.

This gave the client reassurance that the installation was being planned around the playground's safety requirements rather than simply matching the old surface.

Days Three and Four: Installing the New Wet Pour Surface

Once the substrate was ready, we began laying the new wet pour rubber.

The first stage involved mixing recycled SBR rubber granules with the specified polyurethane binder.

The material was installed to form the shock-absorbing base layer in the areas requiring impact attenuation.

Our team then progressed with the coloured EPDM wearing course.

The EPDM granules were mixed with binder and carefully hand-trowelled to create a consistent surface.

We used green and blue to define the main playground areas, with orange around the climbing structure.

Particular attention was given to the edges around equipment supports and the connections with adjoining surfaces.

These details required careful finishing to achieve suitable transitions and reduce the likelihood of premature edge deterioration.

Day Five: Final Checks and Curing

The final working day was dedicated to inspecting the completed installation, checking the finished edges and tidying the site.

We reviewed the surface for consistency and checked that the agreed design had been installed correctly.

The playground remained closed while the polyurethane binder cured.

We explained to the client that curing periods depend on the specific materials, temperature and environmental conditions, so reopening needed to follow the manufacturer's requirements.

We also recommended an appropriate inspection of the completed playground before it returned to public use.

The Handover Conversation

At handover, the playground manager was pleased that the existing play equipment had been retained while the deteriorated flooring was replaced.

They commented that the new surface made the playground feel refreshed without changing the layout that local families were familiar with.

We discussed routine maintenance, including removing debris, checking high-wear areas and arranging repairs promptly if damage develops.

We also explained that wet pour rubber surfacing should be inspected regularly, particularly around equipment supports, seams and perimeter edges.

The installation took approximately five working days on site, followed by the required curing and reopening checks.

A Practical Improvement for a Popular Playground

The completed resurfacing project addressed the worn and damaged flooring that had prompted the original enquiry.

The new wet pour system provided a continuous surface with impact-attenuating construction specified for the relevant play equipment.

The refreshed colours also improved the overall appearance of the playground while retaining its familiar layout.

For our team, the project highlighted the value of assessing a playground before recommending major replacement works.

In this case, the client did not need an entirely new playground. They needed the existing facility to be brought back into better condition through carefully planned resurfacing.

By concentrating on the deteriorated flooring and preparing the underlying construction properly, we were able to deliver a targeted improvement that suited the client's requirements.

Playground Resurfacing Services Across the UK

We help schools, nurseries, councils, parks and community organisations explore playground resurfacing, wet pour rubber installation and safety surface repairs across the UK.

Whether your playground has worn rubber flooring, damaged edges or ageing impact-attenuating surfaces, our team can assess the existing conditions and discuss suitable repair or replacement options.

Contact us today to request a quotation and find out how we can help improve your outdoor play facilities.

Get in Touch

We aim to get back to you in 1 working day.


Skip to

Privacy Information

Social Links